Scaffolding Sweeping The Pole Of The Acceptance
Feb 10, 2018

(1) sweeping pole must be connected with the pole, not sweeping pole and sweeping pole connection;

(2) The level difference of sweeping pole shall not be more than 1m, the distance to the slope shall not be less than 0.5m;

(3) vertical sweep bar should be fixed at a right angle from the base of the epithelium is not greater than 200mm at the pole;

(4) horizontal sweep bar should be fixed at a right angle fasteners close to the vertical sweep bar below the pole.